Removal of temporary haul road at The Bristol Zoo Project

Location : The Brstol Zoo Project

This project involves the excavation and removal of the temporary stone access road, using mechanical plant, followed by the reuse of the recovered material to regrade and improve levels within the site car park area. The works are designed to maximise material reuse on site, reduce waste disposal, and improve overall site functionality.

Scope of Works

  • Strip and remove existing stone road construction
  • Load and transport recovered material using dumpers
  • Prepare receiving car park area
  • Place, spread, and regrade material to required levels
  • Compact and finish surface to specification