BP Technology Centre
Venturer was contracted by the BP Technology Centre to remove over 1,500 m2 of block paving and replace it with permeable paving to facilitate installation of new vehicle charging points at the ir site.
This Included :
- Removal and disposal of the existing paving & bed
- Installation of a new permeable bed
- relaying of new permeable blocks
- White lining and painting of the new EV charging bays